S278 & S38 Highway Works
We build S278 and S38 highway works to the highway authority's specification — junction improvements, site accesses, estate roads, kerbing, drainage and surfacing — self-delivered by our own plant and crews, from setting out to final inspection.
The Two Routes
A Section 278 agreement covers works to an existing public highway — a new junction, site access or carriageway widening — paid for by the developer. A Section 38 agreement covers a new road built to adoptable standard and then offered to the highway authority for adoption. Large developments commonly need both.
We are the contractor, not the highways consultant. The agreement, the technical approval submission and the bond sit with the developer's consultant and the authority. We price and construct the works to the approved drawings.
What We Build
One contractor for the civils package — the same crews lay the drainage, set the kerbs and surface the road, so there is no interface to manage between trades.
Works to the existing adopted highway, funded by the developer.
New roads built for adoption by the local highway authority.
Recent Work
Full bridge refurbishment — excavation and deck breakout, temporary structural support, new reinforced concrete, kerbing and footway, through to carriageway resurfacing and reinstatement.



Common Questions
We are engaged by the main contractor or developer delivering the scheme, not by the authority. We price and build the works to the approved drawings and specification, and work to the authority's inspection regime so the scheme reaches adoption without abortive work.
Yes. Deep drainage is one of our core disciplines, so gullies, connections, carrier drains and attenuation are self-delivered by the same crews building the carriageway. That keeps the drainage and the road surface under one contractor and one programme.
A commuted sum is a one-off payment to the highway authority towards the future maintenance of anything non-standard it is being asked to adopt — block paving, special surfacing, structures or street furniture that costs more to maintain than the standard detail. It is agreed between the developer and the authority, and it is not part of the construction price.
Yes. Most Section 278 work is on highway that stays open, so the traffic management regime the authority permits — lane closures, temporary signals, convoy working or night shifts — shapes the programme as much as the construction does. We price the works around the permitted regime rather than assuming full closure.
Yes. A Section 38 road is adopted only after a maintenance period, and anything the authority lists at inspection has to be put right before adoption and bond release. We stay responsible for the works we built through that period.
The construction programme depends on the scope and the traffic management the authority permits. The agreement and technical approval stage runs ahead of construction and is set by the highway authority and the developer's consultant, not by the contractor.
Send us the approved drawings, the specification or the tender pack — we'll come back with a competitive, deliverable price.